CHINKED HOME IN COCKATOO
VICTORIA

A chinked Log Shell Ready For Disassembly

Aerial View
 
******DAY
1*****
Now beginning to load the Trucks with the
Sub-Floor Log Floor Joist
 
Getting down to the last few logs
 
Cutting in the Power Points
 
Finished loading the last logs
Arrived
at site
*****DAY 2*****
 
First thing to do is lay the ant capping and
timber packer for the logs to be loaded onto

Drilling for the hurricane rods and power points
for wiring
 
First round of log work down ready for the rest
of the logs to be stacked and the crane driver having a relax!!
A few more logs loaded now
 
The Log beam being placed to support the upper
story floor joist notice the square tenon notch
*****DAY
3*****
 
Now the Log sub-floor is in place
The
Veranda beam goes into place as well as the veranda posts
 
Loaded and braced the King & Queen Posts
ready for the Ridge & Purlin Logs
*****DAY
4*****
 
Now we prepare to cut out all the Windows and
Doors

All the Windows And Doors are cut out ready for
the window sills to be cut level
 
Cutting the window sills level and then sanding
them smooth
 
Cutting the angle on the doors and windows
 
Sanding the angles
Some
finished photos of the roof system

Another angle showing the King & Queen Post
roof system
 
Some of the feature scare logs we used one on the
veranda post the other post supporting the upper sub-floor
 
And finished now ready to go home to start the
next project
|