Buxton Log Home

This Log Home located in Buxton Victoria, has a beautiful setting amongst tall Gum Trees.

This is the first Log Home to be put onto a 600mm Stub Wall made with bricks which will later be Stone Clad, the purpose of this Stub Wall

was the owners requested to build on a concrete slab, and to get the Log walls above the ground level to reduce splash from rain water to prevent any damage to the Log's

this was the solution

The Log wall being completed at our Log yard with the Log Floor Beams and Joist in place
The Log wall being completed at our Log yard with the Log Floor Beams and Joist in place
Setting out the Truss Table to make the Full Round Necked Down Log Truss
Finishing off the Log Rafter
All the Log Ridge Poles and Purlins
Beginning to assemble the roof system at the Log Yard just to make sure it all fits
Putting the Log Ridge in place over the main entrance
Craning into position the Collar Tie truss over the two side wings of the house which will lead into the two bedrooms, the Collar Tie Truss gives you clear access underneath but functioning the same as normal Strut Truss
All finished, now we can mark out the positions to drill the holes for the Power access and Hurricane Rods
Loading the Trucks in the Log Yard ready to move to its permanent site
Almost there, last couple of items then we are ready to go
Arriving at the site and preparing the Ant Capping for the first Sill Log
Assembling the Trusses then they will be craned aside until we have all the walls up
Putting the Through Bolt Connectors in place to hold the Jack Post
The first Sill Logs are now in place so we check we are square and tie the Sill Logs to the Foundation.
A close up of the Sill Log being tied to the foundation
Now we can stack all the logs back
The boys are happy we are on the home run
Getting up their now just putting the log beams in place for the upper story.
Now we have the upper story in place and the last Log Walls we can now start to put the roof system up
Craning into position the first Strut Truss
Here comes the Collar Tie Truss
And all the Ridge Poles and Purlins are in place
All done re-assembling now we can start cutting out the windows and doors
The Owner has put his first couple of coats of exterior stain on
An internal view looking into what will be the master bedroom
All finished now we can go home to start the next Log Home
Internal shot looking into the Kitchen area through the Log Archway
Looking from the back onto the rear porch area