Some photos of Corryong being Disassembled &
Re-assembled
![Hammer-asleep.jpg](http://greatbearloghomes.com.au/uploadedFiles/1113902975937-1124.jpg)
The Cattle Dog hard at work, or at least thinking
about it, oh.......... What A Life For Some
![corryong14.jpg](http://greatbearloghomes.com.au/uploadedFiles/1097733511187-7042.jpg)
THREE METER VERANDA
![Internal-3.jpg](http://greatbearloghomes.com.au/uploadedFiles/1113952154828-9908.jpg)
![Internal-2.jpg](http://greatbearloghomes.com.au/uploadedFiles/1113952147703-8165.jpg)
![Internal-1.jpg](http://greatbearloghomes.com.au/uploadedFiles/1113952138406-6841.jpg)
![Fire-place.jpg](http://greatbearloghomes.com.au/uploadedFiles/1113952164765-6542.jpg)
![Fish.jpg](http://greatbearloghomes.com.au/uploadedFiles/1113952174187-4186.jpg)
![corryong1.jpg](http://greatbearloghomes.com.au/uploadedFiles/1097733399406-5860.jpg)
THIS HOME IS TO BE LOCATED AT CORRYONG,THE RIDGE
LOG JUST ABOUT TO BE PLACED ON THE TRUCK
![corryong2.jpg](http://greatbearloghomes.com.au/uploadedFiles/1097733410265-9116.jpg)
ALMOST HALF WAY
![corryong3.jpg](http://greatbearloghomes.com.au/uploadedFiles/1097733418656-2865.jpg)
FIRST LOGS BEING PLACED ON SITE
![corryong4.jpg](http://greatbearloghomes.com.au/uploadedFiles/1097733426203-9967.jpg)
UP TO THE HEADER LOGS
![corryong5.jpg](http://greatbearloghomes.com.au/uploadedFiles/1097733433734-7216.jpg)
RE-ERECTED SHELL
![corryong6.jpg](http://greatbearloghomes.com.au/uploadedFiles/1097733441562-2714.jpg)
NOW A COAT OF PAINT AND THE GABLE END FRAMES ARE
INSTALLED
![corryong7.jpg](http://greatbearloghomes.com.au/uploadedFiles/1097733448750-8666.jpg)
EXPOSED OREGON RAFTERS INSTALLED, AND DOUBLE END
BLOCKED AT THE RIDGE, WE ALSO BOLT THE RAFTERS TOGETHER FOR
SEPARATION AND UPLIFT
![corryong8.jpg](http://greatbearloghomes.com.au/uploadedFiles/1097733456312-3008.jpg)
THE RAFTERS ARE NOW INSTALLED, WE NOW ADD ANGLE
BRACKETS WHICH ARE COACH BOLTED TO THE PLATE LOG'S ALSO FOR
SEPARATION AND UPLIFT, AND THE END BLOCKS ARE SEALED WITH CAULKING
TO FORM AN AIR TIGHT SEAL
![corryong9.jpg](http://greatbearloghomes.com.au/uploadedFiles/1097733463187-1995.jpg)
ONCE ALL THE RAFTERS HAVE BEEN FIXED IT IS NOW
TIME FOR THE TIMBER CEILING LINING
![corryong10.jpg](http://greatbearloghomes.com.au/uploadedFiles/1097733475250-2459.jpg)
NOW WE PLACE THE DUMMY BATTENS TO FORM AN AIR
SPACE FOR THE POLYSTYRENE ROOF INSULATION
![corryong11.jpg](http://greatbearloghomes.com.au/uploadedFiles/1097733483781-1725.jpg)
R 14 INSULATED POLYSTYRENE SHEETS BEING
PLACED
![corryong12.jpg](http://greatbearloghomes.com.au/uploadedFiles/1097733494812-0838.jpg)
NOW WE LAY SISALATION PAPER AND BATTEN THE ROOF
READY FOR THE CORONA ROOF TILES
![corryong13.jpg](http://greatbearloghomes.com.au/uploadedFiles/1097733503390-0197.jpg)
CORONA ROOF TILES BEING INSTALLED
![corryong15.jpg](http://greatbearloghomes.com.au/uploadedFiles/1097733518828-1999.jpg)
SOME FEATURE STONE WORK TO FINISH OFF THE VERANDA
POSTS
![Doormer-2.jpg](http://greatbearloghomes.com.au/uploadedFiles/1113902474656-7304.jpg)
CORRYONG HOUSE FINISHED TO LOCKUP STAGE