Some photos of Corryong being Disassembled &
Re-assembled
The Cattle Dog hard at work, or at least thinking
about it, oh.......... What A Life For Some
THREE METER VERANDA
THIS HOME IS TO BE LOCATED AT CORRYONG,THE RIDGE
LOG JUST ABOUT TO BE PLACED ON THE TRUCK
ALMOST HALF WAY
FIRST LOGS BEING PLACED ON SITE
UP TO THE HEADER LOGS
RE-ERECTED SHELL
NOW A COAT OF PAINT AND THE GABLE END FRAMES ARE
INSTALLED
EXPOSED OREGON RAFTERS INSTALLED, AND DOUBLE END
BLOCKED AT THE RIDGE, WE ALSO BOLT THE RAFTERS TOGETHER FOR
SEPARATION AND UPLIFT
THE RAFTERS ARE NOW INSTALLED, WE NOW ADD ANGLE
BRACKETS WHICH ARE COACH BOLTED TO THE PLATE LOG'S ALSO FOR
SEPARATION AND UPLIFT, AND THE END BLOCKS ARE SEALED WITH CAULKING
TO FORM AN AIR TIGHT SEAL
ONCE ALL THE RAFTERS HAVE BEEN FIXED IT IS NOW
TIME FOR THE TIMBER CEILING LINING
NOW WE PLACE THE DUMMY BATTENS TO FORM AN AIR
SPACE FOR THE POLYSTYRENE ROOF INSULATION
R 14 INSULATED POLYSTYRENE SHEETS BEING
PLACED
NOW WE LAY SISALATION PAPER AND BATTEN THE ROOF
READY FOR THE CORONA ROOF TILES
CORONA ROOF TILES BEING INSTALLED
SOME FEATURE STONE WORK TO FINISH OFF THE VERANDA
POSTS
CORRYONG HOUSE FINISHED TO LOCKUP STAGE