This job located 20 minutes from Canberra CBD
and has a mixture of Post & Beam section and
chinked Log Walls , this made for some interesting challenges
for our settling
![1.jpg](http://greatbearloghomes.com.au/uploadedFiles/1193280502609-8290.jpg)
The beginning, laying the first couple of
rounds
![2.jpg](http://greatbearloghomes.com.au/uploadedFiles/1193280533609-5667.jpg)
![3.jpg](http://greatbearloghomes.com.au/uploadedFiles/1193280551437-1025.jpg)
Above half way now
![4.jpg](http://greatbearloghomes.com.au/uploadedFiles/1193280558312-4115.jpg)
Completed the walls and have cut the roof
pitch
![5.jpg](http://greatbearloghomes.com.au/uploadedFiles/1193280566843-8280.jpg)
The joinery at the intersection of the Post &
Beam top plates
![6.jpg](http://greatbearloghomes.com.au/uploadedFiles/1193280574765-1718.jpg)
Assembled the roof at our log yard in Mansfield
to check all the measurements
![7.jpg](http://greatbearloghomes.com.au/uploadedFiles/1193280581515-9336.jpg)
Ready to pack up onto the truck and move to
site
![8.jpg](http://greatbearloghomes.com.au/uploadedFiles/1193280592437-0883.jpg)
We needed a little help getting this truck up the
drive way
![9.jpg](http://greatbearloghomes.com.au/uploadedFiles/1193280601812-0619.jpg)
First layers of the sill logs going down
![10.jpg](http://greatbearloghomes.com.au/uploadedFiles/1193280609265-9257.jpg)
A few more rounds of log work in place
![11.jpg](http://greatbearloghomes.com.au/uploadedFiles/1193280616890-4347.jpg)
Assembling the roof over the Log Walls
![12.jpg](http://greatbearloghomes.com.au/uploadedFiles/1193280624625-2937.jpg)
Now to install the post for the Prow Front
![13.jpg](http://greatbearloghomes.com.au/uploadedFiles/1193280632562-6656.jpg)
Cutting out some doors and windows
![14.jpg](http://greatbearloghomes.com.au/uploadedFiles/1193280639203-6853.jpg)
All finished
![15.jpg](http://greatbearloghomes.com.au/uploadedFiles/1193280645984-0730.jpg)
A nice scare feature was chosen for the Log
Truss |