This job located 20 minutes from Canberra CBD
and has a mixture of Post & Beam section and
chinked Log Walls , this made for some interesting challenges
for our settling
The beginning, laying the first couple of
rounds
Above half way now
Completed the walls and have cut the roof
pitch
The joinery at the intersection of the Post &
Beam top plates
Assembled the roof at our log yard in Mansfield
to check all the measurements
Ready to pack up onto the truck and move to
site
We needed a little help getting this truck up the
drive way
First layers of the sill logs going down
A few more rounds of log work in place
Assembling the roof over the Log Walls
Now to install the post for the Prow Front
Cutting out some doors and windows
All finished
A nice scare feature was chosen for the Log
Truss |